Service 01 / 010

Kitchen remodels.

The room everyone ends up in. Layouts that work, cabinets that last, and counters you will not want to cover up.

Timeline
4 to 6 weeks
Estimate
Free
Kitchen remodels
(Approach)

A kitchen remodel touches every trade in the house: framing, plumbing, electrical, cabinets, stone, tile and paint. We manage all of it on one schedule, so there is no week where nothing happens because the countertop installer is waiting on the plumber.

(What's included)

Every step. One contractor.

  1. 01

    Design & layout

    Measured drawings, layout options and a materials board before anything gets ordered.

  2. 02

    Demo & protection

    Dust walls, floor protection and daily cleanup. The rest of the house stays livable.

  3. 03

    Rough-ins

    Licensed plumbing and electrical, new circuits, lighting plan and permits handled.

  4. 04

    Cabinets & tops

    Semi-custom or custom cabinets, islands, quartz or natural stone, undermount sinks.

  5. 05

    Backsplash & finishes

    Tile, trim, hardware, appliance install and paint, all managed by us.

  6. 06

    Final walkthrough

    Punch list, a deep clean and a walk-through of the finished room with you.

(Scope)

Pick your scope. Priced after the visit.

Every project is priced after a free walkthrough. These are the levels projects usually fall into, so you know what to expect.

Option 01

Refresh

Same layout, all new surfaces.

  • New cabinets or refaced boxes
  • Quartz countertops
  • Backsplash tile
  • Lighting upgrade
Get a quote
Option 03

Full renovation

Walls move, everything is new.

  • Structural wall removal
  • Custom cabinetry
  • Stone & premium appliances
  • Open-plan flooring throughout
Get a quote
(Signs it is time)

When to start planning.

  • Cabinet doors that no longer close or hang unevenly
  • Counters that are stained, chipped or too small to work on
  • A layout that makes you walk in circles to cook
  • Outdated wiring, few outlets or poor lighting
  • Water damage under the sink or around the dishwasher
(What affects the price)

What drives the cost.

  • Whether the layout changes (moving a sink, range or wall adds plumbing, electrical and permits)
  • Cabinet type: stock, semi-custom or custom, and how long they take to arrive
  • Countertop material and how much edge and cutout work it needs
  • What is behind the walls and floor once demolition starts
  • Appliance choices, especially ones that need new venting or gas lines
(Free estimate)

Want an exact number? Get a free quote.

Leave your number and a project lead calls you back to set up a free walkthrough.

Or call 717-809-9991

We reply within one business day. No spam, ever.

(Timeline)

4 to 6 weeks. Start to finish.

  1. Phase 01

    Design & order

    2 to 3 wks

  2. Phase 02

    Demo & rough-in

    1 wk

  3. Phase 03

    Cabinets & tops

    2 wks

  4. Phase 04

    Finish & punch

    1 wk

(FAQ)

Kitchens questions.

(Free estimate)

Want a kitchens quote? Send your number.

Leave your number and a project lead calls you back to set up a free walkthrough.

Or call 717-809-9991

We reply within one business day. No spam, ever.

Finished living room with new floors and fresh paint
(Next step)

That room you keep apologizing for? Let's fix it.