Kitchen remodel timeline: what happens and when

Most of a kitchen remodel happens before anyone swings a hammer. Knowing the order helps you plan meals, work and the rest of the house around it.
1. Design, selections and ordering
Layout, cabinets, counters, tile, sink, faucet and lighting are chosen and ordered first. This is often the longest stretch because cabinets and special-order items can take weeks to arrive. A good contractor orders before demolition so your kitchen is not torn out and left waiting.
2. Demolition and rough-in
Old cabinets, counters and flooring come out. Plumbing, electrical and venting are adjusted, and any hidden problems, such as damaged subfloor or outdated wiring, are found and corrected. This is when permits and inspections matter most.
3. Walls, floors and cabinets
Drywall is repaired or replaced and painted, flooring goes in, and the cabinets are installed and leveled. Cabinet installation is detail work: a few millimeters off at the start shows up as gaps at the end.
4. Countertops, backsplash and finishes
Stone and quartz countertops are usually templated after the cabinets are set, then fabricated, which adds days. Backsplash tile, sink, fixtures, appliances and hardware follow.
5. Punch list and final walkthrough
You walk the finished kitchen with the contractor, note small fixes and agree when they will be completed.
What slows a kitchen down
- Selections that are not made in time
- Backordered cabinets, tile or appliances
- Surprises behind the walls
- Changes to the plan once work has started
- Waiting on inspections
Ask for a written schedule with milestones, and agree on who to call when something moves.