How to read a remodeling quote

Two quotes for the same room can look very different. The difference usually sits in what is included, not in the total at the bottom.
What a clear quote includes
- A scope of work that names each task: demolition, framing, plumbing, electrical, finishes.
- Materials with brands, models or specifications, not just "tile" or "cabinets".
- The total price and a payment schedule tied to progress.
- Start and estimated completion dates.
- How changes are handled and priced.
Allowances
An allowance is a placeholder budget for something not yet chosen, such as tile or fixtures. If your choices cost more than the allowance, the total goes up. A low total built on low allowances is not a low price.
Exclusions
Look for what is not included: permits, disposal, painting, electrical or plumbing by others, or repairs to hidden damage. Ask the contractor to list them.
Compare like with like
Lay quotes side by side. If one is much lower, find out what it leaves out. Ask each contractor to explain any difference.
